Home » MINIMUM TIME FOR FORMWORK REMOVAL

MINIMUM TIME FOR FORMWORK REMOVAL

 

DETERMINATION OF MINIMUM TIME FOR FORMWORK REMOVAL

The Construction services provided by NeoDex implement the pull-out technique for the correct Concrete Quality Control delivered on site.

The advantages provided to our customers with NeoDex are:

– Cost savings by avoiding work delay
– Safely minimizing the Formwork removal time
– Detection of possible problems in the concrete at early age (0 to 7 days)
– Monitoring the increase of concrete strength before formwork removal.
– Determining concrete strength at older ages
– Evaluate the type of executed curing method
– Assess the concrete casting procedures

Request A Quote with our Services